Abstract

The increasing demand for electricity in urban areas of Indonesia demands diversification of sustainable energy sources. On-grid Solar Power Plants (PLTS) are a strategic alternative to reduce dependence on fossil fuels and increase household energy resilience. However, optimizing PLTS design still faces technical and structural challenges, such as the mismatch between panel production capacity and electricity consumption patterns, limited space, and weak regulatory support and fiscal incentives. This study uses a qualitative approach with a case study in an urban housing complex to examine the design process, implementation, and obstacles of on-grid PLTS. Data were obtained through in-depth interviews, field observations, and studies of policy and technical documents. The results of the study indicate that the success of PLTS implementation is highly dependent on a design that is contextual to the technical and social characteristics of housing, the support of fiscal policies such as initial subsidies, and institutional integration between communities, local governments, and the private sector. In addition, community-based approaches such as energy cooperatives can increase inclusive system adoption. This study concludes that on-grid PLTS is not only a technical solution for the clean energy transition, but also an instrument of socio-economic transformation that requires multidimensional synergy in its implementation in the urban environment of Indonesia

Downloads

Download data is not yet available.

References

Amanda, R., Putri, S. A., Arifan, Y. N. M., Hidayat, R., & Ikaningtyas, M. (2024). Optimalisasi Proses Operasional dengan Menggabungkan Teknologi IoT dan Big Data: Studi Kasus pada PT Pertamina dalam Industri Minyak dan Gas Operational Process Optimization by Combining IoT and Big Data Technology: A Case Study on PT Pertamina in the Oil. Economics And Business Management Journal (EBMJ), 3(01), 93-102.

Arfan, Z., Damayanti, D. D., & Rachmat, H. (2025). Meminimalkan Total Maintenance Cost Pada Mesin Injection Molding Sendok Takar Obat Cv Xyz Menggunakan Analisis Repair Policy Dan Preventive Maintenance Policy. eProceedings of Engineering, 12(1).

Arifin, B., Handayani, E. S., Yunaspi, D., Erda, R., & Dhaniswara, E. (2023). Transformasi Bahan Ajar Pendidikan Dasar Ke Arah Digital: Optimalisasi Pembelajaran Pendidikan Sekolah Dasar Di Era Teknologi Cybernetics. Innovative: Journal Of Social Science Research, 3(5), 1-10.

Aryza, S., & Novelan, M. S. (2025). Mekatronika: Integrasi, Kontrol dan Sistem. Serasi Media Teknologi.

Baru, J., Sabirin, S., Adhim, F., Saputra, R., & Siregar, B. H. (2024). ANALISIS PEMBELAJARAN SMK N 1 CILEGON YANG DIARAHKAN UNTUK MEMPERSIAPKAN PESERTA DIDIK MEMASUKI LAPANGAN PEKERJAAN: STUDI KASUS. Jurnal Pendidikan Ilmiah Transformatif, 8(12).

Bokrantz, J., Skoogh, A., Berlin, C., Wuest, T., & Stahre, J. (2020). Smart Maintenance: a research agenda for industrial maintenance management. International journal of production economics, 224, 107547.

Defriyanti, A., & Ernawati, D. (2021). Analisis dan Mitigasi Risiko Pada Supply Chain dengan Pendekatan Metode House Of Risk (HOR) di PT. XYZ. JUMINTEN, 2(6), 36-47.

Harianja, R., Tarigan, A. S. P., & Anisah, S. (2025). Pengaruh Pemeliharaan Predictive Maintenance Terhadap Kinerja Sistem Distribusi di Wilayah Rawan Gangguan. Jurnal Indragiri Penelitian Multidisiplin, 5(2), 54-62.

Herwantono, H., & Nugraha, E. H. (2022). Pengelolaan Dan Pengembangan Sumber Daya Manusia Pada Pt. Pelindo Marine Service. Jurnal Investasi, 8(1), 70-79.

Judijanto, L., Setiawan, Z., Wiliyanti, V., Gunawan, P. W., Suryawan, I. G. T., Mardiana, S., ... & Joni, I. D. M. A. B. (2024). Literasi Digital di Era Society 5.0: Panduan Cerdas Menghadapi Transformasi Digital. PT. Sonpedia Publishing Indonesia.

Lubis, M. A. (2017). Pengaruh Penerapan Sistem Informasi Pemeliharaan Peralatan Dan Mesin Kantor Pada Efisiensi. Jurnal Edik Informatika Penelitian Bidang Komputer Sains dan Pendidikan Informatika, 3(1), 8-17.

Manalu, I. (2020). Analisais Pelaksanaan Pemeliharaan Mesin Guna Meningkatkan Efisiensi Biaya Pemeliharaan Mesin Extruder Pada PT. Elang Perdana Tyre Industry (Doctoral dissertation, Fakultas Ekonomi Dan Bisnis Universitas Pakuan).

Markulik, S., Turisova, R., Nagyova, A., Vilinsky, T., Kozel, R., & Vaskovicova, K. (2021). Production process optimization by reducing downtime and minimization of costs. In Advances in Physical, Social & Occupational Ergonomics: Proceedings of the AHFE 2021 Virtual Conferences on Physical Ergonomics and Human Factors, Social & Occupational Ergonomics, and Cross-Cultural Decision Making, July 25-29, 2021, USA (pp. 220-227). Springer International Publishing.

Mursidi, M., & Sarjito, A. (2025). Implementation Strategy of Ship Engine Maintenance Management System to Improve Operational Efficiency. Jurnal Aplikasi Pelayaran dan Kepelabuhanan, 15(2), 201-214.

Romadhon, M. A. (2024). Strategi Operasional dan Pemeliharaan Preventif untuk Meningkatkan Keandalan dan Kinerja Alat Rubber Tyred Gantry (RTG) di Pelabuhan. Jurnal Ilmiah Wahana Pendidikan, 10(24), 206-211.

Sembiring, N., & Elvira, G. A. (2018, December). Perancangan Jadwal Perawatan Mesin Menggunakan Pendekatan Reliability Centered Maintenance (RCM) pada PT. XYZ. In Talenta Conference Series: Energy and Engineering (EE) (Vol. 1, No. 2, pp. 211-216).

Situngkir, D. I. (2019). Pengaplikasian FMEA untuk mendukung pemilihan strategi pemeliharaan pada paper machine. FLYWHEEL: Jurnal Teknik Mesin Untirta, 1(1), 39-43.

Sopianti, Y. (2020). USULAN PERENCANAAN PERAWATAN MESIN CAKE BREAKER CONVEYOR (CBC) MENGGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) DI PT. X (Doctoral dissertation, Universitas Islam Negeri Sultan Syarif Kasim Riau).

UTOMO, B. (2018). Analisis Pengendalian Downtime Proses Produksi Pada Unit NPK Granulasi I Dengan Menggunakan Konsep Plan, DO, Check, Action (PDCA) di PT Petrokimia Gresik (Doctoral dissertation, Universitas Muhammadiyah Gresik).

Yaqin, R. I., Zamri, Z. Z., Siahaan, J. P., Priharanto, Y. E., Alirejo, M. S., & Umar, M. L. (2020). Pendekatan FMEA dalam Analisa Risiko Perawatan Sistem Bahan Bakar Mesin Induk: Studi Kasus di KM. Sidomulyo. Jurnal Rekayasa Sistem Industri, 9(3), 189-200.

Zaenudin, I., & Riyan, A. B. (2024). Perkembangan Kecerdasan Buatan (AI) Dan Dampaknya Pada Dunia Teknologi. Jurnal Informatika Utama, 2(2), 128-153..

Downloads

Published

2025-06-26

Issue

Section

Articles

How to Cite

Optimization of On-Grid Solar Power Plant Design for Urban Residential Areas: Case Study in Indonesia. (2025). Journal of Renewable Engineering, 2(3), 1-9. https://doi.org/10.62872/677h0736